SUPPLY OF EQUIPMENT FOR SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANT IN VELIPOJA AREA PHASE III- LOT1

Year of Execution
2014-2015

Final Beneficiary
Water Supply & Sewage Utility General Directory

Funding Institution
EC/IPA Countries

Total Value Of The Project
1,266,511.00 Euro

The scope of the project was to improve the living conditions of the population of Albania through aligning to the EU standards, the treated sewerage water, discharged into rivers, lakes, and the sea. This was part of a governmental project, to alleviate the existing serious deficiencies in the water supply and sanitation sector by improving the water supply and sewage collection and treatment services. 

VIBTIS contribution to this project was ensuring the supply, delivery, installation, commissioning, training and after-sales service of the Machinery and Vehicles that have been put in use for the welfare of the Velipoja Water Treatment Plant. 

Equipment’s that VIBTIS has supplied in this project:  Mobile Diesel Pumps; Dumper; Crane Truck; Forklift; PE Welding Equipment; Backhoe Loader; Bypass Discharge Pump; Welding Diesel Generator; Set of Mechanical and Electrical Tools; Pipe Plug Set; Combined Sewerage Trucks; Shop Van 

Partners in this project: Cappellotto; Sacim; IVECO; Trelleborg; Genset; JCB; Varisco; Ausa, Linde, Ritmo. 

FACT: 

VIBTIS LTD HAS DELIVERED THE FIRST VACUUM TRUCK IN ALBANIA WITH 5 RECYCLING STAGES, BECOMING THE LEADER OF THE MARKET IN THE SEWAGE TREATMENT MACHINES.