Purchase & Construction of 20/04 kV Transformation Points and 20kV Metal Clad Switchgears for the Albanian Power Distribution Operator

Year of Execution
2017-2018
Final Beneficiary
OSHE
Funding Institution
World Bank
Total Value Of The Project
Euro 9,600,000
Purchase & Construction of 20/04 kV Transformation Points and 20kV Metal Clad Switchgears for the Albanian Power Distribution Operator
Year of execution 2017 – 2018
This project consists in the Design, Procurement, Construction, Testing and Delivery at client’s warehouse the final product.
The product “Transformation Point” is final product, and it is ready for connection and put into operation in the 20kV distribution grid.
Main equipment’s in this project are:
- 20kV Metal – Clad for Substations
- 20kV SF6 switchgear, line feeder, transformer feeder type
- Distribution transformer oil hermetic type 20/0.4kV (250, 400, 630kVA)
- Low voltage panel, equipped with model case circuit breaker, electronic smart meter, current transformers, copper busbars, auxiliary power supply, lighting, etc.
- Concrete prefabricated kiosk equipped with power supply, lighting, earthing system, basement, metallic doors, metallic louvres, medium volage cables, low voltage cables, etc.
Rehabilitation of 3 existing Tirana Substations/S&I of Equipment and Civil Works” for the Albanian Power Distribution Operator
Year of execution 2020 – 2021
This project consists in the Design, Procurement, Construction, Factory Acceptance Tests, Delivery of goods, Erection Site test, put into operation.
Specialty in this project is working without energy breaks for the consumers (like: families, hospitals, business, etc.). For this purpose, we design and product two mobile substations in order to give power for all consumers 24 hours, during substation rehabilitation.