Supply of pipe, fittings and valves for the Central Gathering System
Projects

Latest Case Studies

HIMARA WASTE TRANSFER STATION
Purchase of 2 waste trucks for Himara waste transfer station Final Beneficiary: Albanian Development Fund (ADF

REHABILITATION OF WTP BADOVAC, INSTALLATION OF WSS SYSTEM AND TEST BENCHES.
Final Beneficiary: KUR Prishtine, Kosove Investor: KWF SCADA is considered to be ’the brain’ of every system. The ma

WASTE WATER TREATMENT PLANT
Final Beneficiary Water Supply & Sewage Utility Korce, Shkoder, Pogradec, Prishtine etc, Investor: KWF, The scope

SANITARY LANDFILL MALIQ. LOT 2,3,4
PROCURMENT OF EQUIPMENT FOR THE SANITARY LANDFILL MALIQ. LOT 2,3,4 Final Beneficiary: KRWM Korca Regional Solid Waste

NATIONAL ARENA STADIUM
CONSTRUCTION OF THE NEW COMPLEX NATIONAL ARENA STADIUM Final Beneficiary: Albanian Football Federation Investor: FINM

ALBANIAN POWER DISTRIBUTION OPERATOR (OSHEE SH.A.).
PURCHASE OF 20/04 KV TRANSFORMATION POINTS AND 20 KV METAL CLAD SWITCHGEARS FOR SUBSTATIONS FOR THE ALBANIAN POWER DI
