Supply of equipment for substation for OST (Albanian Power Transmision Operator)

Supply of equipment for substation for OST (Albanian Power Transmision Operator)

Year of Execution 2020

Final Beneficiary OST

Funding Institution OST

Total Value Of The Project 800,000 Euro

220kV SF6 Circuit Breaker

110kV SF6 Circuit Breaker

110kV Current Transformer

110kV Capacitive Voltage Transformer

110kV Disconnector

110kV Surge Arrestor

35,20,10,6kV Current Transformer

35,20,10,6kV Voltage Transformer

Fiber Optics equipment for mainetance