Electrical & Instrumentation Detailed Design, Procurement and Supervision of Crude Oil Tank Farm














Electrical & Instrumentation Detailed Design, Procurement and Supervision of Crude Oil Tank Farm
Year of Execution
Final Beneficiary
Funding Institution
Total Value Of The Project
This project consisted in Designing, Procuring, Construction and Start Up of a tank farm for separation, storing and selling of crude oil. VIBTIS has been engaged since the design phase, HAZOP study, procurement and supervision of installations.
Project technical specific requirements were:
– Tank Blanketing with Nitrogen
– Overfill Prevention SIL2 through Level Switch
– Liquid Interface Level Measurement through Guided Wave Radar
– Custody Transfer Flowmeters
– ESD – Emergency Shut Down System
– Control and Safety System with Redundant SIS Controllers
– SCADA Reporting System